Free Returns
Learn More.
Free Returns
Enjoy free UK-wide shipping on all PetPure™ orders!
We deliver quickly and securely so your pet’s protection arrives right on time.
We stand by our products.
If you’re not 100% satisfied with your PetPure™ Tag, contact us within 30 days for a hassle-free replacement or refund.
Product Description
Ultimate Control & Freedom: The Heavy-Duty Retractable Dog Leash
Give your beloved pet the perfect balance of freedom and safety during every walk with our premium retractable dog leash. Engineered for durability and comfort, this heavy-duty lead features an intuitive one-button lock system and is available in multiple lengths and vibrant colors to match your style. Perfect for daily walks, training sessions, or allowing your dog to explore safely in open areas.
🌟 Key Features & Walking Benefits
We have carefully designed this dog walking leash to maximize control and comfort:
Superior Durability: Built with an ultra-strong, tangle-resistant cord and robust plastic casing for reliable, long-lasting use on active dogs.
Quick-Response Lock: Features a simple One-Button Brake and Lock System that offers instant, reliable control, enabling you to manage your dog's distance effortlessly and safely.
Ergonomic Comfort Grip: The anti-slip rubber handle is designed to fit perfectly and comfortably in your hand, significantly reducing strain and ensuring full control during those long adventures.
Multiple Length Options: Choose the ideal length—3 meters, 5 meters, or 8 meters—for maximum versatility, whether you are training close-by or giving your dog room to roam.
All-Size Suitability: The durable construction and quality hardware make this leash safely suitable for small, medium, and large dogs (up to a specific weight capacity—we should add this detail if available).
🛡️ Built to Last: Quality You Can Trust
Forget flimsy leads that compromise safety. Our long dog leash is constructed with premium, pet-safe materials:
Robust Cord: High-strength internal cord is optimized for thousands of smooth and consistent retractions, ensuring resilience walk after walk.
Strong Hardware: Includes a corrosion-resistant, chrome-plated hook for a secure, dependable attachment to any collar or harness.
Smooth Mechanism: Equipped with a stainless steel spring coil for effortless, quiet, and consistent retraction every time.
📐 Specifications
Lengths Available: 3 meters, 5 meters, 8 meters
Colors: Available in multiple vibrant choices (e.g., Blue, Green, Pink, Orange, Grey, Purple)
Handle Material: Anti-slip Rubber and Durable ABS Casing
Lock System: Instant One-Touch Brake and Lock Mechanis
Why Choose PetPure?
Discover the natural, safe, and effective way to protect your furry friend from fleas and ticks.
All-Natural Protection
Free from harsh chemicals or toxins.
Long-Lasting Defense
Up to 8 months of continuous flea & tick protection.
Vet Approved
Safe for cats of all ages and breeds.
Water Resistant
Perfect for indoor and outdoor cats.







